A. An applicant may submit materials up to 30 days in advance of an application for a construction permit or master permit. The information submitted along with a pre-application may include the following information:

1. The name and address of the applicant;

2. Identification of all carriers using the facility;

3. The type of facility proposed;

4. Preliminary engineering plans, specifications, and maps of the facilities to be located within the public right-of-way;

5. Detailed construction plans demonstrating compliance with all applicable city codes and construction specifications, including the city’s engineering standards;

6. A brief description of nonconfidential, nonproprietary utility or wireless telecommunications services that are or will be offered or provided by the applicant over its facilities;

7. A brief description of nonconfidential, nonproprietary transmission medium that will be used to offer or provide such services;

8. An accurate map showing the location of any existing utilities and/or wireless telecommunications facilities in the city that the applicant intends to use or lease;

9. If installation of overhead facilities is proposed, evidence that surplus space is available for locating the facilities on existing utility poles along the proposed route;

10. The area or areas of the city the applicant desires to serve and a schedule for building out (offering service to) the entire area covered by the master permit;

11. Proof of compliance with the other provisions of this chapter, including but not limited to the indemnity, insurance, and bond requirements; and/or

12. Information to establish that the applicant has obtained all other governmental approvals and permits to construct and operate the facilities, and to offer or provide the services, including, but not limited to, evidence that the applicant has registered with the Washington Utilities and Transportation Commission. (Ord. 3039 § 2, 2019)