Skip to main content
Loading…
This section is included in your selections.

A. An optional pre-application may be submitted up to 30 days prior to the submission of an eligible facilities request application, or a permit application associated with a small wireless facility or other wireless facility. The information submitted along with a pre-application may include the following information:

1. The name and address of the applicant.

2. Identification of all carriers using the facility.

3. The type of facility proposed.

4. If the applicant is not the owner or person in control of the eligible support structure or site, an attestation that the owner or person in control of the eligible support structure and/or site has consented to the proposed facility modification. If the eligible support structure is to be located within a public right-of-way, the applicant must also attest that the applicant has authorization to install, maintain, and operate transmission equipment in, under and above the public right-of-way.

5. A stamped report by a state of Washington registered professional engineer demonstrating compliance with existing structural, electrical, and safety codes, and describing the general structural capacity of the eligible facility, small wireless facility, or other wireless facility.

6. Detailed site plan and drawings.

7. Dimensioned elevation drawings of the existing tower or structure showing the existing and proposed antennas, and equipment structures (at 1/8" = 1' or comparable scale).

8. Copies of the land use or building permit approval that authorized the original installation of the tower or wireless facilities on the structure.

9. If new equipment cabinets, generators, or any other ground equipment components are being proposed, an assessment of noise that shows compliance with city and/or federal noise standards.

10. A description of compliance with the applicable visibility and performance standards set forth in AMC 19.68.200.

11. A stamped report by a state of Washington registered professional engineer demonstrating compliance with radio-frequency emissions standards. (Ord. 3038 § 3, 2019)