Skip to main content
Loading…
Article II. General Requirements
This article is included in your selections.
This section is included in your selections.

This article contains the basic requirements that apply to the SEPA process. The city of Anacortes (“city”) adopts the following sections of Chapter 197-11 of the Washington Administrative Code by reference:

WAC

197-11-040 Definitions.

197-11-050 Lead agency.

197-11-060 Content of environmental review.

197-11-070 Limitations on actions during SEPA process.

197-11-080 Incomplete or unavailable information.

197-11-090 Supporting documents.

197-11-100 Information required of applicants.

197-11-158 SEPA/GMA project review—Reliance on existing plans, laws, and regulations.

197-11-210 SEPA/GMA integration.

197-11-220 SEPA/GMA definitions.

197-11-228 Overall SEPA/GMA integration procedures.

197-11-230 Timing of an integrated GMA/SEPA process.

197-11-232 SEPA/GMA integration procedures for preliminary planning, environmental analysis, and expanded scoping.

197-11-235 SEPA/GMA integration documents.

197-11-238 SEPA/GMA integration monitoring.

197-11-250 SEPA/Model Toxics Control Act Integration.

197-11-253 SEPA lead agency for MTCA actions.

197-11-256 Preliminary evaluation.

197-11-259 Determination of nonsignificance for MTCA remedial actions.

197-11-262 Determination of significance and EIS for MTCA remedial actions.

197-11-265 Early scoping for MTCA remedial actions.

197-11-268 MTCA interim actions. (Ord. 3046 § 1 (Att. A), 2019; Ord. 2471 § 1, 1998)