Skip to main content
Loading…
This section is included in your selections.

Tree Conservation Affidavit

BUILDING PERMIT/SITE DEVELOPMENT PERMIT NO. _____

THIS PERMIT AUTHORIZES _____
TO BEGIN _____
IN _____ SUBDIVISION OR AT THE FOLLOWING ADDRESS:
_____.

THE AUTHORIZED PERSON ACKNOWLEDGES THAT HE/SHE IS RESPONSIBLE FOR TAKING ADEQUATE STEPS TO:

1. Protect the tree retention areas on this lot as identified in the tree preservation plan (normally the front, rear, and or side yard areas) in accordance with the standards of Chapter 16.50 — Tree Conservation.

2. Field locate, mark, and protect all tree conservation areas on the site during construction. Marking shall consist of tape, ribbon, or tags attached to the retained trees and protective fencing secured by posts set at least 12" into the ground installed in accordance with the requirements of 16.50.150. All tree identification and fencing shall be installed prior to site development and construction and shall remain and be maintained until home construction is 100% completed.

3. Install any trees on the lot required by the approved tree preservation plan.

FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL RESULT IN THE ISSUANCE OF A STOP WORK ORDER OR OTHER CITATIONS.

CITY OFFICIAL ____________ APPLICANT ____________

EFFECTIVE THIS ____________ DAY OF ____________ 20 ____________.

NOTE: DISPLAY THIS PERMIT AT THE MAIN POINT OF ACCESS AND VISIBLE FROM THE STREET.

(Ord. 2756 Att. F, 2006)